EDUR
Edur Pumpenfabrik, a renowned German manufacturer specializing in high-performance pump systems, aimed to expand its production capacity with a new state-of-the-art facility in Kiel. The goal was to develop a modern production hall integrated with a functional and efficient office extension to support operations, innovation, and team collaboration. As part of the project, our team delivered a turnkey construction solution that combined precision engineering with practical design. The facility, spanning approximately 8,000 sqm, was designed to optimize workflow efficiency, promote sustainability, and meet the client’s high standards for quality and performance.
Project Overview
Project Name
EDUR Production Facility and Office Extension
Location
Kiel, Germany
Construction Period
January 2014 – December 2014
Client Background
Edur Pumpenfabrik is a renowned German manufacturer specializing in high-quality pumps and pumping systems for diverse industries, including water treatment, chemical processing, and industrial manufacturing. Known for innovation, precision, and sustainability, Edur consistently delivers efficient and reliable solutions to global clients.
Objective
Develop and deliver a modern, high-performance production hall and office extension for Edur Pumpenfabrik to support their expanding manufacturing operations and provide state-of-the-art workspaces for their engineering and administrative teams.
Scope
Construction of a new production hall and adjoining office building.
Deliver the project as a turnkey construction, providing a fully operational facility upon completion.
Integration of efficient workflows between production and administrative zones.
Implementation of sustainable and high-quality building materials suited for industrial use.
Key Details
Office Area: approx. 2,000 sqm
Production Hall Area: approx. 6,000 sqm
Construction Type: Turnkey project
Function: Pump production and administrative headquarters
Design Approach and Execution
Concept and Vision
The project aimed to merge industrial functionality with modern design and energy efficiency. The production hall was designed for optimal workflow, durability, and scalability, while the office extension emphasized comfort, daylight integration, and a professional environment that reflects Edur’s engineering excellence.
Execution
Phase 1: Planning and Coordination
Developed a detailed construction schedule to align all project activities and ensure timely progress.
Conducted regular coordination meetings with subcontractors to review work sequences and address potential conflicts.
Facilitated clear communication between design, procurement, and on-site teams to maintain workflow consistency.
Phase 2: Construction Management and Site Supervision
Oversaw day-to-day site operations, ensuring compliance with drawings, specifications, and safety standards.
Performed precise measurements and documentation to maintain accuracy across all construction stages.
Supervised subcontractor performance, verifying adherence to schedule, quality, and safety benchmarks.
Phase 3: Quality Assurance and Acceptance
Conducted systematic inspections and testing of completed works to ensure compliance with project requirements.
Documented acceptance results and identified areas for corrective action when necessary.
Coordinated with subcontractors to promptly resolve any defects or non-conformities discovered during inspections.
Phase 4: Handover and Completion
Delivered the project as a fully finished turnkey facility, ready for immediate operational use.
Verified that all technical systems and finishes met the client’s quality and performance standards.
Ensured a seamless final acceptance process, supported by complete documentation and post-handover coordination.
The new Edur production hall and offices exceeded expectations. The seamless coordination and attention to detail throughout the construction process ensured a smooth transition from concept to completion — a true reflection of professional project management.
Results and Acknowledgments
Outcome
Efficient Turnkey Delivery: The facility was delivered on schedule, fully ready for immediate operation.
Quality Assurance: Comprehensive inspections and quality control ensured all works met German industrial standards.
Enhanced Operations: The new space optimized production workflows and provided a modern office environment for Edur’s staff.
Professional Growth: The project served as a significant milestone in developing advanced skills in coordination, quality management, and subcontractor oversight.